Commercial roofing repairs by Quarry Roofing trace the leak source first. The work covers TPO, EPDM and modified bitumen on flat and low-slope roofs, flashing, seams and roof drains, and clay tile, concrete tile or slate on commercial buildings, with minimal business disruption.
Would a free estimate help you plan?
Ceiling stains rarely sit directly under the failure. The trace follows the water back to where it actually enters.
| Where water gets in | What you see | Our repair |
|---|---|---|
| Split seams on TPO, EPDM or modified bitumen | Drips along a line | Seam repair |
| Lifted flashing at parapet walls | Wet walls, stains near the edge | Reflashing |
| Rooftop HVAC curbs | Water around the units | Curb flashing |
| Roof drains and ponding water | Standing water days after rain | Drain clearing, low-spot fix |
| Blisters and punctures in the field | Bubbles or holes | Membrane patching with GAF materials |
| Cracked or slipped clay tile, concrete tile, slate Our specialty |
Leaks under tile or slate sections | Tile and slate section replacement |
Four steps, always in this order.
Seams, flashing, curbs and drains are checked until the source is confirmed.
When water is already inside the building, the area is tarped or sealed before anything else.
Patch, seam, flashing or drain work that closes the opening for good.
Roof coating that extends the repaired membrane’s life, backed by a preventive maintenance plan.
Office buildings, retail stores, restaurants, warehouses, schools, churches, apartment and mixed-use buildings and industrial buildings each get a schedule built around their hours. Your hours set the schedule.
Access is roof-only. Work starts early or after hours where needed, tenants get notice first, drains stay clear, and the roof is sealed at the end of every day.
Which hours suit your building?
It depends on the lease type. Tenants usually pay under a triple-net lease, landlords under a gross lease.
Open seams, lifted parapet flashing, leaking HVAC curbs, clogged drains and ponding, plus membrane blisters and punctures.
Commercial roofing repairs run inspection first, a temporary seal if water is entering, the permanent fix, then coating and maintenance.
Membranes run about 15 to 30 years, while clay tile, concrete tile and slate run 50 to 100 or more. Once the whole membrane is failing, replacing the roof outright makes more sense than patching.
The estimate is free across Queens. Would you rather call (929) 521-6548, or describe where the water shows up?