Our process at Quarry Roofing runs the same path on every roof: free estimate, on-site inspection with photos, written scope, scheduled crew, daily cleanup and final walkthrough.
Would you rather start with the estimate form or a call?
Each stage ends with something you can check the job against.
| Stage | What we do | What you have in hand afterward |
|---|---|---|
| First call or estimate request | Note roof type, problem and access | Booked visit time |
| Inspection visit | Walk the roof and check and photograph deck, flashing and drainage | Dated photos of each defect |
| Written estimate review | Explain the scope and give an honest repair or replace recommendation | Written scope and price |
| Materials and scheduling | Select materials, file permits where required, plan around the forecast | Start date and material list |
| Work days | Site preparation, underlayment and flashing, installation | Photo updates each evening |
| Final walkthrough and follow-up | Quality check with you, then a return visit after the first heavy rain | Signed-off roof, rechecked after rain |
Clay tile, concrete tile and slate must match what is already on your roof in profile, color and thickness. During tear-out the crew salvages every sound piece and reuses it where it shows. Replacements come from salvage stock or the original maker, using the same matching and salvage method applied on slate repairs.
Sourcing can add a few days before the start date, often on Tudor-style and older attached homes. Your schedule already allows for it.
Your property is covered before tear-off, and the finished roofs and properties left clean show how it looks after.
Tarps go over plantings, siding and walkways first.
The neighbor’s roofline and shared walls are covered as well.
Nails and old material are cleared every evening.
The same person answers your questions and sends progress updates with photos.
Once materials arrive and any permit is issued. You get the start date in writing when you sign.
Your roof is closed in at the end of each day. Crews open only what they can underlay and seal before the rain.
Work on that area stops until you approve it. You receive photos and a written price per sheet before any decking is replaced.
Yes. Our process keeps the same six stages, with board approvals, tenant notices and roof access added to the schedule.
The on-site inspection is the first stage of everything above. You keep the photos and written scope either way.