Our 6-Step Roofing Process: Inspection to Rain Check

Our process at Quarry Roofing runs the same path on every roof: free estimate, on-site inspection with photos, written scope, scheduled crew, daily cleanup and final walkthrough.

Would you rather start with the estimate form or a call?

Quarry Roofing crew leader walking a Queens homeowner through the roof inspection photos before the written estimate

Six stages, and what each one leaves with you

Each stage ends with something you can check the job against.

Stage What we do What you have in hand afterward
First call or estimate request Note roof type, problem and access Booked visit time
Inspection visit Walk the roof and check and photograph deck, flashing and drainage Dated photos of each defect
Written estimate review Explain the scope and give an honest repair or replace recommendation Written scope and price
Materials and scheduling Select materials, file permits where required, plan around the forecast Start date and material list
Work days Site preparation, underlayment and flashing, installation Photo updates each evening
Final walkthrough and follow-up Quality check with you, then a return visit after the first heavy rain Signed-off roof, rechecked after rain

Tile and slate add steps before the start date

Clay tile, concrete tile and slate must match what is already on your roof in profile, color and thickness. During tear-out the crew salvages every sound piece and reuses it where it shows. Replacements come from salvage stock or the original maker, using the same matching and salvage method applied on slate repairs.

Sourcing can add a few days before the start date, often on Tudor-style and older attached homes. Your schedule already allows for it.

Roofer sorting salvaged slate and clay tiles by color and profile beside a Tudor-style Queens home

Protection, cleanup and one person to call

Your property is covered before tear-off, and the finished roofs and properties left clean show how it looks after.

  • House and grounds

    Tarps go over plantings, siding and walkways first.

  • Attached and two-family homes

    The neighbor’s roofline and shared walls are covered as well.

  • Daily cleanup

    Nails and old material are cleared every evening.

  • One point of contact

    The same person answers your questions and sends progress updates with photos.

Start dates, rain and damage found mid-job

How soon after the written estimate can work start?

Once materials arrive and any permit is issued. You get the start date in writing when you sign.

What happens if rain is forecast mid-job?

Your roof is closed in at the end of each day. Crews open only what they can underlay and seal before the rain.

What if you find rotted decking or more damage once the old roof is open?

Work on that area stops until you approve it. You receive photos and a written price per sheet before any decking is replaced.

Do you follow the same process on co-op, multi-family and commercial buildings?

Yes. Our process keeps the same six stages, with board approvals, tenant notices and roof access added to the schedule.

Book the free inspection visit

The on-site inspection is the first stage of everything above. You keep the photos and written scope either way.